2847 Cummings, Berkley: Studs to Addition

2847 Cummings, Berkley: From Studs to a Finished Addition

In 2018 I took a house in Berkley down to the studs and built an addition on it. These are my notes from the walk-through videos I shot while the work was going on, plus a few photos of the finished house.

Down to the studs

When I walked it with my crew in April 2018, the house was already stripped to the studs. The roof was an 8/12 pitch over a single room. The subfloor was staying, so people could walk on it while we worked. The siding was aluminum, and I told the contractor that whoever takes it off can get a couple hundred bucks for the aluminum. The electrical meter was being moved out of the way, with my electrician on site.

Room to work

The driveway was 12 feet wide, so there was plenty of room to set a 40-yard dumpster and still get around it. That kind of thing matters when you’re planning a job. I always check where the dumpster goes.

The addition

By June the new garage had already been framed, and the old roof was coming off for the addition. On the video I said the addition was going to add 1,500 square feet.

Finished

If you have a house that’s worn out, outdated, or needs more than you want to take on, I’ll talk to you about buying it as-is.

Have a house like this?

Tell me about it. No repairs, no agent fees, and you pick the closing date. Call or text me at (248) 977-8481 or get a cash offer.

Steve Moves Michigan
33 Hiram, Orion Township, MI 48360
(248) 977-8481
stevemovesmichigan.com